2 legs down...2 to go...
Sunday, October 13, 2013
Sunday, September 15, 2013
Festool Style Bench
SketchUp Drawing
Hard maple, black melamine sheet, Record vise
Kreg bench dogs
Zyliss Carving Station
Bench assembled with 1/2" bolts
Clamping Racks
3/4" Delrin studs fitted on the bottom for mounting in the hole pattern
Aux Table in place
Aux Table setup for carving
Base Cabinet begins
Drawer boxes complete and installed...drawer fronts are next
Lower cabinet is finished
Another view
Sunday, August 18, 2013
Base for a Henkel-Harris display cabinet
I began with the ogee bracket feet
The case was dovetailed
and glued
The interior partitions were added
The Base Frame was glued up
The Base Frame was fitted to the case
Case, Feet and Frame are assembled
The Drawers were next
Drawers are complete
Cock Bead being installed on a Drawer
Beaded Drawer in the Case...nice fit
Ready for final sanding and finish
Case stained...drawers next
Ready for the finish
Finished and in place
Complete with top
Another look
Sunday, July 14, 2013
Huntboard
Virginia Huntboard finished and in the dining room
Parts on the bench ready for assembly
Dry assembled
Drawer sides dovetailed
Cock beading applied to one of the drawers
Top mould applied
Stained and ready for finish
Chippendale Wall Shelf
Tuesday, April 16, 2013
Saturday, March 23, 2013
Subscribe to:
Posts (Atom)